1 00:00:07,269 --> 00:00:05,349 three heavy space vehicles are being 2 00:00:10,390 --> 00:00:07,279 developed by the national aeronautics 3 00:00:15,749 --> 00:00:10,400 and space administration 4 00:00:20,470 --> 00:00:18,150 this film report number 16 will cover 5 00:00:28,150 --> 00:00:20,480 progress on the saturn 1 and 1b during 6 00:00:32,150 --> 00:00:29,990 a significant highlight of this report 7 00:00:34,790 --> 00:00:32,160 period was the checkout of pad b 8 00:00:38,310 --> 00:00:34,800 facilities launch complex 37 at cape 9 00:00:40,869 --> 00:00:38,320 canaveral using the sad5 booster the s4 10 00:00:42,470 --> 00:00:40,879 dynamics facility stage and ground 11 00:00:44,470 --> 00:00:42,480 support equipment 12 00:00:47,510 --> 00:00:44,480 wet tests at canaveral are designed to 13 00:00:50,389 --> 00:00:47,520 check out complex 37 equipment involved 14 00:00:52,950 --> 00:00:50,399 in propellant loading operations actual 15 00:00:55,029 --> 00:00:52,960 propellants are used in the tests 16 00:00:57,270 --> 00:00:55,039 simulated manual loading methods are 17 00:00:59,910 --> 00:00:57,280 checked first then the entire loading 18 00:01:01,510 --> 00:00:59,920 sequence is performed automatically 19 00:01:03,670 --> 00:01:01,520 some difficulties were encountered 20 00:01:05,350 --> 00:01:03,680 during first phase testing requiring 21 00:01:07,670 --> 00:01:05,360 additional components 22 00:01:09,750 --> 00:01:07,680 tests were resumed and successfully 23 00:01:11,910 --> 00:01:09,760 completed late in june 24 00:01:14,149 --> 00:01:11,920 following wet tests inspection revealed 25 00:01:16,950 --> 00:01:14,159 two welts on the hydrogen side of the 26 00:01:19,270 --> 00:01:16,960 common bulkhead of the s4 dynamics 27 00:01:21,030 --> 00:01:19,280 facility stage however the bulkhead 28 00:01:23,190 --> 00:01:21,040 showed no signs of leakage during the 29 00:01:25,510 --> 00:01:23,200 liquid hydrogen loading tests and the 30 00:01:32,710 --> 00:01:25,520 stage is acceptable for stratification 31 00:01:36,950 --> 00:01:34,950 also at the atlantic missile range work 32 00:01:38,550 --> 00:01:36,960 on saturn launch sites is progressing 33 00:01:40,950 --> 00:01:38,560 satisfactorily 34 00:01:43,510 --> 00:01:40,960 construction of launch complex 34's 35 00:01:45,510 --> 00:01:43,520 liquid hydrogen facility is on schedule 36 00:01:51,429 --> 00:01:45,520 with completion expected late next 37 00:02:01,030 --> 00:01:54,550 the design work on pad a complex 37 to 38 00:02:04,789 --> 00:02:02,789 the saturn one instrument unit 39 00:02:07,350 --> 00:02:04,799 electrical support equipment for pad b 40 00:02:10,550 --> 00:02:07,360 complex 37 arrived at the cape in late 41 00:02:15,510 --> 00:02:12,630 meanwhile at marshall the booster for 42 00:02:17,670 --> 00:02:15,520 the fifth saturn one flight vehicle sa5 43 00:02:19,589 --> 00:02:17,680 entered post static checkout 44 00:02:22,229 --> 00:02:19,599 discrepancies were discovered 45 00:02:24,229 --> 00:02:22,239 particularly in the propulsion system 46 00:02:26,070 --> 00:02:24,239 rework was necessary 47 00:02:28,309 --> 00:02:26,080 following completion of rework 48 00:02:29,350 --> 00:02:28,319 electrical systems checkout started in 49 00:02:31,110 --> 00:02:29,360 mid-may 50 00:02:33,670 --> 00:02:31,120 the booster will be shipped for arrival 51 00:02:37,350 --> 00:02:33,680 at the cape about two weeks before s45 52 00:02:41,910 --> 00:02:39,830 located at marshall's quality division 53 00:02:44,309 --> 00:02:41,920 is a saturn instrument unit motion 54 00:02:46,790 --> 00:02:44,319 simulator used for attitude calibration 55 00:02:49,270 --> 00:02:46,800 of the stabilizer and control system of 56 00:02:51,110 --> 00:02:49,280 the sa-5 instrument unit 57 00:02:53,830 --> 00:02:51,120 positioning capabilities are in three 58 00:02:56,229 --> 00:02:53,840 axes with displacement accuracy of one 59 00:02:57,830 --> 00:02:56,239 percent of displacement angle 60 00:02:59,910 --> 00:02:57,840 positioning the unit for attitude 61 00:03:02,070 --> 00:02:59,920 calibrations and simulated flight 62 00:03:04,309 --> 00:03:02,080 position leaves all components in their 63 00:03:06,229 --> 00:03:04,319 respective flight configurations 64 00:03:09,750 --> 00:03:06,239 eliminating loading effects from long 65 00:03:11,670 --> 00:03:09,760 cables and extraneous noise pickup 66 00:03:13,350 --> 00:03:11,680 the control system has automation 67 00:03:15,509 --> 00:03:13,360 capabilities that can be computer 68 00:03:17,270 --> 00:03:15,519 controlled permitting complete automated 69 00:03:23,430 --> 00:03:17,280 calibration and checkout of control 70 00:03:28,470 --> 00:03:25,589 the booster for the sixth flight vehicle 71 00:03:30,869 --> 00:03:28,480 sa-6 underwent two successful static 72 00:03:32,949 --> 00:03:30,879 test firings at marshall's test division 73 00:03:35,750 --> 00:03:32,959 the first for 35 seconds and the second 74 00:03:37,830 --> 00:03:35,760 for a period of 142 seconds 75 00:03:40,789 --> 00:03:37,840 post test inspection revealed minor 76 00:03:42,949 --> 00:03:40,799 discrepancies such as small fuel leaks 77 00:03:49,670 --> 00:03:42,959 and a torn gox diffuser screen 78 00:03:54,710 --> 00:03:52,309 the sa-6 booster second in the block 2 79 00:03:59,190 --> 00:03:54,720 series is now undergoing post static 80 00:04:03,429 --> 00:04:01,190 assembly of the booster for the seventh 81 00:04:05,429 --> 00:04:03,439 saturn flight test vehicle sa-7 was 82 00:04:11,350 --> 00:04:05,439 completed this quarter and the stage is 83 00:04:15,429 --> 00:04:13,270 structural fabrication of the spider 84 00:04:18,469 --> 00:04:15,439 beam for the ninth saturn flight vehicle 85 00:04:20,469 --> 00:04:18,479 sa-9 is complete assembly operations on 86 00:04:24,310 --> 00:04:20,479 the tail section and clustering of tanks 87 00:04:28,070 --> 00:04:26,150 the fairchild stratos corporation of 88 00:04:30,150 --> 00:04:28,080 hagerstown maryland is now underway in 89 00:04:32,390 --> 00:04:30,160 the fabrication of various components 90 00:04:34,230 --> 00:04:32,400 related to the micro meteoroid 91 00:04:36,550 --> 00:04:34,240 measurement device which will fly aboard 92 00:04:38,629 --> 00:04:36,560 sa-9 and sa-8 93 00:04:44,710 --> 00:04:38,639 manufacturing of the wing panels for the 94 00:04:49,670 --> 00:04:46,870 testing wing panel capacitors is 95 00:04:51,749 --> 00:04:49,680 accomplished by using a vacuum belt jar 96 00:04:54,390 --> 00:04:51,759 electronic components are subjected to 97 00:04:56,469 --> 00:04:54,400 rigid testing prior to acceptance 98 00:05:00,790 --> 00:04:56,479 micro modules are inspected through the 99 00:05:04,790 --> 00:05:02,550 chrysler corporation production 100 00:05:06,469 --> 00:05:04,800 contractor for saturn one and one b 101 00:05:08,629 --> 00:05:06,479 boosters at marshall's michoud 102 00:05:10,629 --> 00:05:08,639 operations in new orleans complete 103 00:05:12,230 --> 00:05:10,639 clustering of all propellant containers 104 00:05:14,550 --> 00:05:12,240 for the booster for the eighth flight 105 00:05:17,110 --> 00:05:14,560 vehicle sa-8 during this quarter 106 00:05:21,110 --> 00:05:17,120 delivery has been made of all h1 engines 107 00:05:25,110 --> 00:05:23,189 also fabrication of the barrel assembly 108 00:05:27,749 --> 00:05:25,120 and thrust and fin outriggers for the 109 00:05:29,430 --> 00:05:27,759 10th flight vehicle essay 10 is complete 110 00:05:32,469 --> 00:05:29,440 fabrication of the spider beam and 111 00:05:34,310 --> 00:05:32,479 thrust structure is underway 112 00:05:36,150 --> 00:05:34,320 at marshall's mishu operations 113 00:05:37,990 --> 00:05:36,160 construction work this quarter included 114 00:05:40,070 --> 00:05:38,000 the building of electronic fabrication 115 00:05:41,830 --> 00:05:40,080 and checkout facility 116 00:05:43,510 --> 00:05:41,840 and the installation of air conditioning 117 00:05:46,310 --> 00:05:43,520 systems in various offices and 118 00:05:50,310 --> 00:05:48,469 all construction work is being done 119 00:05:52,390 --> 00:05:50,320 under the direction of michoud's support 120 00:05:55,110 --> 00:05:52,400 services contractor the mason rust 121 00:05:58,950 --> 00:05:57,189 dynamic testing of the s4 stage 122 00:06:00,950 --> 00:05:58,960 instrument unit with both the jupiter 123 00:06:03,110 --> 00:06:00,960 nose cone and the boilerplate apollo 124 00:06:05,029 --> 00:06:03,120 spacecraft began at marshall's test 125 00:06:08,950 --> 00:06:05,039 division early this quarter and was 126 00:06:14,230 --> 00:06:11,749 the sad5 booster at the cape for complex 127 00:06:16,710 --> 00:06:14,240 37 facilities checkout was removed from 128 00:06:18,390 --> 00:06:16,720 pad b in late june and will be returned 129 00:06:23,350 --> 00:06:18,400 to marshall during the next quarter for 130 00:06:27,029 --> 00:06:25,350 a new clean facility was placed in 131 00:06:29,350 --> 00:06:27,039 operation this quarter in marshall's 132 00:06:31,430 --> 00:06:29,360 manufacturing engineering division the 133 00:06:32,870 --> 00:06:31,440 clean area is subjected to a higher 134 00:06:35,350 --> 00:06:32,880 internal air pressure in order to 135 00:06:38,070 --> 00:06:35,360 minimize the possibility of contaminants 136 00:06:39,990 --> 00:06:38,080 entering the room from external sources 137 00:06:41,830 --> 00:06:40,000 saturn vehicle parts to be clean are 138 00:06:44,710 --> 00:06:41,840 disassembled and passed through a drying 139 00:06:49,510 --> 00:06:46,870 then washed in an electronic cleaning 140 00:06:51,749 --> 00:06:49,520 vat filtering equipment removes 141 00:06:54,950 --> 00:06:51,759 contaminants down to the 10 micron or 142 00:06:58,550 --> 00:06:56,950 a final check of the part is made by 143 00:07:00,870 --> 00:06:58,560 using a microscope 144 00:07:03,350 --> 00:07:00,880 after completion of the cleaning process 145 00:07:05,749 --> 00:07:03,360 all parts are hermetically sealed then 146 00:07:08,390 --> 00:07:05,759 sent to the user 147 00:07:10,870 --> 00:07:08,400 the rl10 engine hydraulic actuator 148 00:07:12,950 --> 00:07:10,880 simulator for the s4 stage was tested 149 00:07:15,430 --> 00:07:12,960 this quarter at marshall for test 150 00:07:18,790 --> 00:07:15,440 purposes an engine is not used but is 151 00:07:21,430 --> 00:07:18,800 simulated by the masses pendulum 152 00:07:23,670 --> 00:07:21,440 two hydraulic actuators mounted 90 153 00:07:27,510 --> 00:07:23,680 degrees to each other represent either 154 00:07:29,589 --> 00:07:27,520 the vehicle's pitch or yaw axis 155 00:07:31,270 --> 00:07:29,599 the hydraulic actuator system reacts to 156 00:07:33,430 --> 00:07:31,280 the angle commanded by the vehicle's 157 00:07:35,749 --> 00:07:33,440 guidance system allowing for attitude 158 00:07:37,990 --> 00:07:35,759 control in the pitch and yaw planes 159 00:07:39,990 --> 00:07:38,000 stabilization and reduction of vehicle 160 00:07:42,230 --> 00:07:40,000 bending 161 00:07:44,150 --> 00:07:42,240 test analysis will help determine if the 162 00:07:47,110 --> 00:07:44,160 flight control circuits and mechanical 163 00:07:50,309 --> 00:07:47,120 power converters are adequate to satisfy 164 00:07:52,390 --> 00:07:50,319 vehicle requirements for flight 165 00:07:53,909 --> 00:07:52,400 at platten whitney's florida research 166 00:07:56,869 --> 00:07:53,919 and development center at west palm 167 00:07:59,270 --> 00:07:56,879 beach s4 stage rl10 engines are 168 00:08:01,670 --> 00:07:59,280 thoroughly inspected prior to acceptance 169 00:08:03,510 --> 00:08:01,680 each engine is inspected visually then 170 00:08:04,790 --> 00:08:03,520 taken into a booth for a black light 171 00:08:07,350 --> 00:08:04,800 inspection 172 00:08:09,430 --> 00:08:07,360 using an ultraviolet lamp all pump 173 00:08:11,830 --> 00:08:09,440 inlets and valves are examined carefully 174 00:08:13,909 --> 00:08:11,840 for defects utmost precautions are 175 00:08:20,309 --> 00:08:13,919 always taken with all parts associated 176 00:08:24,950 --> 00:08:22,869 after its final acceptance test each 177 00:08:26,629 --> 00:08:24,960 rl10 engine is weighed with all 178 00:08:28,390 --> 00:08:26,639 equipment attached 179 00:08:30,309 --> 00:08:28,400 the vehicle manufacturer must know the 180 00:08:31,909 --> 00:08:30,319 engine center of gravity since this is a 181 00:08:37,029 --> 00:08:31,919 factor which can strongly affect the 182 00:08:41,190 --> 00:08:39,110 at marshall's test division construction 183 00:08:43,350 --> 00:08:41,200 work was completed this quarter on a 184 00:08:52,949 --> 00:08:43,360 prototype sound suppression stand which 185 00:08:58,230 --> 00:08:56,150 the 165 000 pound thrust engine is fired 186 00:09:00,550 --> 00:08:58,240 into the suppressor tank results of the 187 00:09:03,430 --> 00:09:00,560 firings will provide data related to the 188 00:09:05,430 --> 00:09:03,440 basic acoustical scaling laws the sound 189 00:09:07,430 --> 00:09:05,440 suppression facility will itself be a 190 00:09:09,350 --> 00:09:07,440 model for much larger power plant 191 00:09:11,030 --> 00:09:09,360 suppression systems 192 00:09:13,190 --> 00:09:11,040 acoustic measurements are made during 193 00:09:17,590 --> 00:09:13,200 tests to check the effectiveness of the 194 00:09:22,230 --> 00:09:20,070 at rocketdyne's canoga park facility 195 00:09:24,070 --> 00:09:22,240 stainless steel furnace brazed thrust 196 00:09:26,470 --> 00:09:24,080 chambers for h1 engines are being 197 00:09:34,790 --> 00:09:26,480 developed to provide longer test life 198 00:09:39,269 --> 00:09:36,630 the first unit has successfully 199 00:09:41,350 --> 00:09:39,279 completed 2300 seconds of main stage 200 00:09:45,990 --> 00:09:41,360 engine test and the overall braze 201 00:09:50,070 --> 00:09:47,829 another development at rocketdyne was 202 00:09:52,070 --> 00:09:50,080 the testing of three types of injectors 203 00:09:53,190 --> 00:09:52,080 the low differential pressure fuel locks 204 00:09:57,750 --> 00:09:53,200 injector 205 00:10:01,910 --> 00:09:59,670 and the low differential pressure fuel 206 00:10:03,750 --> 00:10:01,920 injector the modified wagon wheel 207 00:10:08,710 --> 00:10:03,760 injector exhibited high frequency 208 00:10:13,190 --> 00:10:11,190 on may 4th the s4 battleship test 209 00:10:15,590 --> 00:10:13,200 program was completed at douglas's 210 00:10:18,870 --> 00:10:15,600 sacramento test operations with a final 211 00:10:20,550 --> 00:10:18,880 locks depletion firing of 444 seconds a 212 00:10:22,310 --> 00:10:20,560 total of five thousand four hundred and 213 00:10:26,630 --> 00:10:22,320 forty seconds of engine firings was 214 00:10:30,710 --> 00:10:28,710 at the conclusion of the firing program 215 00:10:33,269 --> 00:10:30,720 gimbal tests were run on the battleship 216 00:10:35,509 --> 00:10:33,279 vehicle to provide needed dynamic data 217 00:10:37,190 --> 00:10:35,519 on the engine actuation system the 218 00:10:39,350 --> 00:10:37,200 battleship tank was then stripped of 219 00:10:41,350 --> 00:10:39,360 accessories five of the engines and the 220 00:10:43,190 --> 00:10:41,360 tank were shipped to marshall the tank 221 00:10:45,350 --> 00:10:43,200 will be used for slash tests and the 222 00:10:50,069 --> 00:10:45,360 engines will be used on the s4 dynamic 223 00:10:54,790 --> 00:10:52,630 on april 1st at sacdo the initial all 224 00:10:57,030 --> 00:10:54,800 systems vehicle propellant loading test 225 00:10:59,190 --> 00:10:57,040 was aborted when a fill nozzle leak 226 00:11:01,110 --> 00:10:59,200 caused damage to the test stand 227 00:11:03,910 --> 00:11:01,120 corrective action was taken and the 228 00:11:06,230 --> 00:11:03,920 second test began on april 9th about one 229 00:11:08,389 --> 00:11:06,240 minute after storage pressure increase 230 00:11:09,750 --> 00:11:08,399 observers noted tank canning in a 231 00:11:11,750 --> 00:11:09,760 vertical plane 232 00:11:13,110 --> 00:11:11,760 canning partially smoothed out after 233 00:11:15,190 --> 00:11:13,120 several seconds 234 00:11:17,750 --> 00:11:15,200 following necessary internal insulation 235 00:11:20,550 --> 00:11:17,760 repair tacking procedures were modified 236 00:11:23,030 --> 00:11:20,560 and tests resumed problems encountered 237 00:11:25,829 --> 00:11:23,040 during detaching indicated leaks in the 238 00:11:27,829 --> 00:11:25,839 common bulkhead 239 00:11:29,829 --> 00:11:27,839 the vehicle was removed from the stand 240 00:11:32,150 --> 00:11:29,839 in mid bay for bulkhead weld and 241 00:11:34,310 --> 00:11:32,160 insulation patching additional tanking 242 00:11:37,030 --> 00:11:34,320 operations on test stand one will begin 243 00:11:40,069 --> 00:11:37,040 early next quarter 244 00:11:42,150 --> 00:11:40,079 on april 16th the s45 flight vehicle was 245 00:11:43,990 --> 00:11:42,160 moved from douglas's santa monica plant 246 00:11:46,389 --> 00:11:44,000 to the docks at san pedro 247 00:11:47,910 --> 00:11:46,399 the stage was transported aboard a barge 248 00:11:50,470 --> 00:11:47,920 to begin its water journey to the 249 00:11:52,550 --> 00:11:50,480 sacramento test facility the stage 250 00:11:54,310 --> 00:11:52,560 arrived at its destination five days 251 00:11:56,470 --> 00:11:54,320 later and was checked out in the 252 00:11:58,949 --> 00:11:56,480 engineering and development building 253 00:12:04,870 --> 00:11:58,959 prior to being installed in test stand 254 00:12:09,590 --> 00:12:07,670 the s45 was installed in test stand 2b 255 00:12:10,470 --> 00:12:09,600 and pre-static checkout began in late 256 00:12:12,629 --> 00:12:10,480 june 257 00:12:18,629 --> 00:12:12,639 a full duration hot firing is scheduled 258 00:12:22,949 --> 00:12:20,790 at santa monica douglas successfully 259 00:12:24,949 --> 00:12:22,959 bulge formed an aluminum sheet yielding 260 00:12:26,310 --> 00:12:24,959 two segments for the s4b stage's 261 00:12:28,230 --> 00:12:26,320 bulkhead dome 262 00:12:29,829 --> 00:12:28,240 bulge die techniques may be used to 263 00:12:31,990 --> 00:12:29,839 augment segment production on the 264 00:12:34,069 --> 00:12:32,000 stretch press 265 00:12:35,670 --> 00:12:34,079 overall construction on the s4b 266 00:12:37,910 --> 00:12:35,680 facilities at huntington beach is 267 00:12:39,670 --> 00:12:37,920 continuing during this quarter the 268 00:12:41,430 --> 00:12:39,680 fabrication and assembly building was 269 00:12:44,069 --> 00:12:41,440 completed and tooling installation was 270 00:12:47,430 --> 00:12:45,750 chicago bridge and iron company 271 00:12:49,750 --> 00:12:47,440 subcontractor for douglas shipped 272 00:12:52,069 --> 00:12:49,760 sections of the battleship tank to sacto 273 00:12:54,710 --> 00:12:52,079 from its salt lake city facility 274 00:12:56,310 --> 00:12:54,720 fabrication of the tank started in april 275 00:13:00,629 --> 00:12:56,320 and is scheduled for completion in 276 00:13:04,629 --> 00:13:02,470 douglas aircraft company has shipped a 277 00:13:07,110 --> 00:13:04,639 full-scale mock-up of the forward dome 278 00:13:08,870 --> 00:13:07,120 and skirt section of the s4b stage to 279 00:13:10,710 --> 00:13:08,880 marshall this quarter 280 00:13:13,269 --> 00:13:10,720 the mock-up will be used in connection 281 00:13:19,509 --> 00:13:13,279 with design of the saturn 1b instrument 282 00:13:24,230 --> 00:13:21,350 a two-month contract was led to 283 00:13:26,389 --> 00:13:24,240 aerospace lines incorporated by marshall 284 00:13:29,829 --> 00:13:26,399 to study the feasibility of using a 285 00:13:32,389 --> 00:13:29,839 modified boeing c97 for air transport of 286 00:13:34,470 --> 00:13:32,399 the s4 stage one and a half million 287 00:13:35,990 --> 00:13:34,480 pound thrust rocket engines and other 288 00:13:37,509 --> 00:13:36,000 massive components 289 00:13:39,750 --> 00:13:37,519 this mode of transportation would 290 00:13:42,230 --> 00:13:39,760 greatly reduce time required to move the 291 00:13:44,069 --> 00:13:42,240 cargo from the west coast to points in 292 00:13:46,710 --> 00:13:44,079 the south and east 293 00:13:49,509 --> 00:13:46,720 the modified strata cruiser now known as 294 00:13:51,990 --> 00:13:49,519 the b377pg 295 00:13:54,629 --> 00:13:52,000 pregnant guppy has successfully 296 00:13:59,269 --> 00:13:54,639 transported an inert saturn stage from 297 00:14:03,670 --> 00:14:01,430 the guppy is now undergoing rigid 298 00:14:05,910 --> 00:14:03,680 testing to prove its takeoff in flight 299 00:14:08,629 --> 00:14:05,920 and landing capabilities during federal 300 00:14:10,470 --> 00:14:08,639 aviation agency qualification tests 301 00:14:13,189 --> 00:14:10,480 these flights are expected to cut 302 00:14:15,189 --> 00:14:13,199 transportation time from three weeks now 303 00:14:17,990 --> 00:14:15,199 required for barging cargo through the